INCREASE THE RELIABILITY OF A WELL HEAD
- Details
- Category: Uncategorised
- Published: Tuesday, 25 January 2022 07:54
- Written by Administrator
- Hits: 2018
Volume 9 (1), January 2022, Pages 88-95
1Mehin Baghirova, 2Shahriyar Mammadov
1Associate professor, department of “Industrial Machines”,, Azerbaijan State Oil and Industry University, phd in technical sciences, Azerbaijan. E-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
2Mechanic, “Azneft” İB, 2nd year graduate student, Azerbaijan State Oil and Industry University, Azerbaijan. E-mail:This email address is being protected from spambots. You need JavaScript enabled to view it.
ABSTRACT
The article describes the completion of drilling a well, lowering and cementing the production line, as well as after digging the cement plug in the casing (the height of the rise of the cement behind the belt if it is determined that there is a cement plug in the casing when determining with an electric thermometer)used to hang safety belts during wellhead equipment information on casing heads, their types and the study of the sealing element.
Keywords: casing head, casing hanger, hermetic knots, casing spool, rubber sealant, metal sealant.